Six conditions that need to be met in the construction of pu sandwich panel production line

Author: Sinowa/Post Date: 2021-08-02/Keywords: pu sandwich panel production line

Sinowa is familiar with the trends of the thermal insulation industry at home and abroad, and always brings effective first information to the readers. Today, I will bring you six conditions that need to be met for the construction of the polyurethane sandwich panel production line:

First of all, the polyurethane sandwich panel base wall should meet the requirements of the specification, and it has been checked and accepted.

pu sandwich panel production line

The construction of the polyurethane sandwich panel project should be carried out after the base layer is painted with a cement mortar leveling layer and the construction quality is qualified.

Before the construction of the thermal insulation project, the outer door and window openings should pass the acceptance, the size and location of the openings should meet the design requirements and the acceptance should be qualified. The door and window frames or auxiliary frames should be installed and waterproofed. The embedded parts and connectors of fire ladders, downpipes, various entrance pipelines and air conditioners that extend out of the wall should be installed, and the thickness of the polyurethane sandwich panel should be reserved.

pu sandwich panel production line

External wall scaffolding for the installation of insulation boards is required, and the scaffolding should be stable and reliable.

The ambient temperature during construction should not be higher than 35℃, should not be lower than 5℃, and should not be lower than 0℃ within 24h, and the wind should not be higher than level 5. Rainproof measures should be taken during construction in rainy days.

pu sandwich panel production line

The incoming materials of polyurethane sandwich panels should be stored in a dry and cool place, and the storage period and conditions should be in accordance with the requirements of the material supplier’s product description.

The above is the construction requirements for polyurethane sandwich panels brought to you today. Sinowa is engaged in pu sandwich panel line equipment and has unique insights on the process of color steel insulation panels. More customers are welcome to come to consult.

Page Url: http://www.yczgjl.com/en/six-conditions-that-need-to-be-met-in-the-construction-of-pu-sandwich-panel-production-line.html

You are here: Home / News / Six conditions that need to be met in the construction of pu sandwich panel production line
Contact Us
Email: sinowa@sinowa.cn
Call: +0086 151 0610 6366
Add: High-tech Industrial Development Zone, Zhenjiang, China
主站蜘蛛池模板: 日韩人妻不卡一区二区三区| 久久精品国产网红主播| 曰韩亚洲av人人夜夜澡人人爽| 强插女教师av在线| 无码人妻av一二区二区三区| 亚洲精品久久久久久久不卡四虎| 亚洲中文字幕无码久久2020| 国产人与禽zoz0性伦| 中文无码一区二区不卡av | 国产亚洲精品aaaaaaa片| 美女网站免费福利视频| 久久久久亚洲av无码专区首| 国产精品99久久久精品无码| 国产一区二区内射最近更新| 亚洲av婷婷五月产av中文| 亚洲国产天堂久久综合| 国产又黄又爽胸又大免费视频| 亚洲精品成人片在线观看精品字幕| 日本乱偷人妻中文字幕| 精人妻无码一区二区三区| 色播亚洲视频在线观看| www国产精品内射老熟女| 精品久久久久久777米琪桃花| 亚洲欧美激情在线一区| 亚洲人成网亚洲欧洲无码久久| 亚洲欧美日韩国产精品专区| a级国产乱理伦片在线播放| 精品久久久久久成人av| 亚洲av色男人的天堂| 亚洲色偷偷综合亚洲av| 色橹橹欧美在线观看视频高清| 亚洲av无码一区东京热不卡| 精品香蕉一区二区三区| 精品人妻久久久久久888| 欧美性欧美巨大黑白大战 | 无码人妻视频一区二区三区| 玩弄丰满少妇视频| 欧美三级乱人伦电影| 久久亚洲中文无码咪咪爱| 欧美三级欧美成人高清| 在线看片无码永久免费aⅴ|